How long kitchen renovation




















STEP City inspections and sign-offs 1 hour on-site If you needed city permits, you may need to have inspections and a final sign-off as well prior to closing up the walls, particularly with gas lines. STEP Installation — floors days To prevent having to redo the floors if you decide to reconfigure your cabinets in the future, make sure that the flooring is consistent throughout the space, even if some of it will be hidden.

STEP Installation — all other material including cabinets and appliances days Installation of all other materials is usually in this order: cabinets, appliances, fixtures and lighting, counters, backsplash, and cabinet hardware.

STEP Punch list items days Depending on what the items are—this could be anything from straightening a cabinet door to waiting on installing that last out-of-stock item—it could take anywhere from a day to several weeks.

Design home how long does a kitchen renovation take kitchen kitchen remodel Kitchen Renovation renovation renovation timeline. Have questions or comments about this post? Join the conversation. Start renovating Sweeten matches home renovation projects with vetted general contractors, offering guidance and financial protection—at no cost to the homeowner.

Start your renovation. Have friends who plan to renovate? Start referring friends. Are you an interior designer, architect, or real estate professional? Start referring design clients Start referring real estate clients. You may also like. Entire Homes. Design kitchen layout open concept kitchen.

Design interior design living room. There is minimal construction or customization involved. Replacement kitchen projects average weeks for a moderate sized kitchen. Kitchen remodeling projects that involve a larger space, wall removals, structural changes, and reconfiguration of the floor plan take longer.

A fair expectation is weeks. An efficient kitchen remodeling project is built around a schedule. Your project manager lays out a series of steps to be completed in sequence. Still, even with the most carefully planned renovation projects, delays can occur—not necessarily because of incompetence or carelessness. Many specialty subcontractors and a lot of special ordered products are involved in a kitchen remodeling project.

That makes for tricky scheduling. Once they are fabricated, the slab is created, delivered, and installed. Now comes the part where your hardwood floors are finished, the plumbing fixtures are completed, the final trim and your backsplashes are done, and painting is started and completed. The final phase of a kitchen remodel includes the installation of your electrical fixtures and new appliances.

Once that is done, the clean up is completed and you can finally use your new kitchen. The total length of time for a kitchen remodel varies from site to site but plan on about a six to eight-week time frame for an average kitchen. Simply contact us and we can make sure you have an effortless experience and most importantly, a brand new kitchen. Must-haves might be a certain color cabinet or countertop or a stove with a built-in griddle. Visiting a showroom is always a great idea so that you can start to ideate your dream kitchen.

A home visit is also needed so that the design team can get a feel for your space. Typically, both this step and the prior one are complimentary. The initial visit to the showroom may also be optional if you already know what you want for your kitchen.

Now comes the really fun part! A good designer will lay out the scope of the project in detail and go over the project in its entirety with you, as well as provide an agreement that can be signed off on. Once the agreement is signed, the real design can get started.

Even if you have a general idea of what your new kitchen will look like for example, maybe you already have the perfect kitchen cabinets picked out , you can never be too specific when remodeling a kitchen.